2017年1月16日星期一

Installation of 320Ton Overhead Crane

Double beam overhead crane double trolley-nucleon crane group

Double beam overhead crane double trolley-nucleon crane group

Double beam overhead crane double trolley

Key words: Double beam overhead crane linkage design double trolley
Abstract: This paper introduces the electric linkage design scheme of a 5 + 5t double-trolley bridge crane in a pipe pile company. As the motor power of each organization in the project is relatively small and the whole machine work is not very frequent, the whole electrical linkage adopts H-linkage Handle the cam controller + resistor + motor to achieve, so that two trolleys can run simultaneously or stand-alone operation, two sets of hoisting mechanism can also be run simultaneously or stand-alone operation. Low cost, simple operation and convenient maintenance, which can meet the requirement of on-site operating conditions, and has certain reference and reference value.
First, Project Background
Double-car bridge crane is suitable for manufacturing workshop, warehouse, yard, hydropower station maintenance, assembly and other places, the general handling loading and unloading operations. PHC pipe pile is a kind of cement product building material with high technological content in the pile foundation engineering of China’s construction industry with the background of the lifting demand of PHC pipe pile in a pipe pile production workshop. It has the characteristics of high bearing capacity, strong penetrating power, short construction period, stable and reliable quality, good anti-seismic and anti-corrosion performance, low comprehensive cost, environmental protection and energy saving, convenient and safe detection. In this project, 5 + 5T double-girder overhead crane is required to realize the whole pipe pile transportation, and also can lift other auxiliary parts separately. This requires that the two trolleys of crane should be designed in electrical control. To meet both to achieve single action can be achieved linkage.
Second, the overall program
Our overall program is divided into mechanical synchronization and electrical synchronization in two parts.
Mechanical synchronization: the lifting of two cars and operating agencies are using the same motor to ensure that the motor speed synchronization. At the same time in order to prevent the collision of two cars, two cars are set between the crash safety foot and crash limit switch, when the two cars running to the limit distance, safety foot crash safety switch, protection circuit power, car stop .

The car general layout structure
Electrical synchronization: The lifting mechanism adopts the cam controller + RT asymmetrical resistor + motor control mode, at the same time, the hoisting mechanism is equipped with the rising limit switch. When the rising position is up, the hoisting control circuit is de-energized. . The operating mechanism of the trolley adopts the cam controller + RT asymmetric resistor + motor control mode, and the trolley running mechanism has the limit limit switch. When the trolley runs to the limit position, the control circuit is de-energized and can only run in the opposite direction.

 Control protection circuit wiring diagram
It should be noted that the linkage consoles of this project need manufacturers to make, we use the H-type handle with buckle lock linkage console, the driver through the right hand can directly operate the lifting mechanism of the two car lift the level of the car before and after the move.
Third, the main electrical components
Lifting motor: YZR160L-6 (S3-40%) 11KW 2 sets
Car motor: YZR112M-6 (S3-25%) 1.8KW 2 units
Integrated protection cabinet: GQR-4800 1 set
Lifting resistor: RT54-160L-6 / 2B-X 2 sets
Car Resistor: RT52-112M-6 / 1B-X 2 sets
Interoperability platform: QT1B-023/4800 1 set
Fourth, the summary
Since the project was put into operation in 2012, the use of good results to meet the customer site daily hanging pipe pile use requirements. As the machine using the traditional cam controller for control, control circuit is simple, easy to maintain later, more suitable for crane work is not too frequent, less demanding on the control of the lifting place.
- See more at: http://www.nucleoncranegroup.com/double-beam-overhead-crane-double-trolley.html

2017年1月12日星期四

china nucleon crane group: Grounding Protection of Bridge crane and Gantry Cr...

china nucleon crane group: Grounding Protection of Bridge crane and Gantry Cr...: Grounding Protection of Bridge crane and Gantry Crane gantry crane "Crane metal structure must have a reliable electrical conne...

Grounding Protection of Bridge crane and Gantry Crane

Grounding Protection of Bridge crane and Gantry Crane
gantry crane
"Crane metal structure must have a reliable electrical connection; work in the track of the crane is generally grounded through the wheels and rails," and provides "ground connection is not less than 150 square cross-section of flat steel or 10 square copper, Using Welding method connection. Under normal circumstances, the metal structure of the crane and all electrical equipment, metal casing, pipe trough, cable metal casing and driver's cab are reliable connection with the cart wheel. Therefore, the emphasis should be placed on the test crane ,Running track and the grounding line connection. According to the "Rules" requirements, at the same time with the following four is considered qualified by the ground
Gantry Crane Electrical
installation:
1) at any point on the crane grounding resistance is not greater than 4 ohms.
2) the grounding line cross-section not less than the "requirements", that is, flat steel is not less than 150mm, copper wire is not less than 10mm.
3) ground wire and grounding body, ground wire and the car track must be reliable welding.
4) The joint of the two rail joint of the main rail is welded with a metal cross connection
However, there are two issues not detailed, in the test had been controversial:
A)In the neutral grounded power grid, should be grounded or connected to zero, many factories use a neutral point directly grounded three-phase four-wire power supply system. According to the principle of protective grounding and the relevant provisions of the work, in this distribution network of cranes, if the simple use of ground protection, and can not completely limit the leakage voltage within the safe range. On the other hand, the ground short-circuit current of one phase is not enough to cause the line protection device on the crane to operate when the single-phase leakage current of the crane power supply, and the dangerous voltage will exist for a long time. Therefore, when the crane power from the neutral point of the three-phase four-wire power system, can only take zero protection, and can not use the ground protection.

B) There should be at least a few ground connections in the same span, depending on the conditions of the units used. In the same span within the crane is also a little less, I think there should be at least two grounded, long track grounding point should be increased accordingly. Because after the long-term use of the rail track, due to poor fixation or lateral dislocation, it is easy to make the ground wire and track welding and rail joints between the jumper wire off, so there must be two or more ground wire is reliable.
For more details, please contact us via info@nucleoncranegroup.com– See more at: http://www.nucleoncranegroup.com