2017年1月17日星期二

60 Ton electric hoist-nucleon crane group

60 Ton electric hoist-nucleon crane group

60 Ton electric hoist
The smooth delivery of Panama 60 Ton electric hoist

On January 9th, 2017, Nucleon crane’s Panama 2 sets 60 Ton electric wire rope hoist has already delivered. This batch of hoistsis wooden case packing, in the wooden case have rainproof cloth. In hoist appearance using the latest technology, appearance is concise, refined design. Nucleon crane’s quality is consistent, we will regularly follow up the user’s usage situation, we are looking forward to the follow-up orders.
electric hoist is one of our main products. We can supply various electric hoist for our client.
For more details, please contact us via info@nucleoncranegroup.com

mobile cranes-nucleon crane group

mobile cranes-nucleon crane group

mobile cranes
Where is the best for mobile cranes?
mobile-cranes
The mobile crane is a crane which can move freely along the track or no track, such as tyre gantry crane, container crane, gantry crane and Boat Lifting Gantry Crane.
For the selection of crane equipment parking location, should also based on specific circumstances
The first is to choose the parking place when the work is to be carried out: try to choose a flat, solid ground for parking, do not work in the puddle of muddy ground, if the site is limited, in order to ensure smooth operation, the slope of the ground shall not > 3 °. In addition, the crane parking place should also ditch, foundation pit and other topographic areas to maintain a certain safe distance, to avoid vibration caused by accidents and other operations.
The second followed by the collection of the parking place when the selection: For storage security considerations, the mobile crane parking place should be chosen to have dedicated staff to watch the park for parking, to prevent someone from destruction or theft. In addition, if it is hot and hot weather, the crane should be parked in a shade covered with shade or cover the place, avoid high temperature lead to damage to the crane internal parts. Of course, parked indoors is the best.
There are some mobile crane is located in coastal areas, but also need to consider factors such as the typhoon winds weather, so the parking place need to choose carefully, to prevent accidental collision by crane some objects of wind blown and damage.
Then when the long-term out of the parking place for choice: if the mobile crane long-term disabled, except in the maintenance need good protection, parked in the choice should be to meet the ventilation, drying, safety, before use to check, to avoid long time not use lead has damaged machine parts.
- See more at: http://www.nucleoncranegroup.com/mobile-cranes.html

2017年1月16日星期一

Installation of 320Ton Overhead Crane

Double beam overhead crane double trolley-nucleon crane group

Double beam overhead crane double trolley-nucleon crane group

Double beam overhead crane double trolley

Key words: Double beam overhead crane linkage design double trolley
Abstract: This paper introduces the electric linkage design scheme of a 5 + 5t double-trolley bridge crane in a pipe pile company. As the motor power of each organization in the project is relatively small and the whole machine work is not very frequent, the whole electrical linkage adopts H-linkage Handle the cam controller + resistor + motor to achieve, so that two trolleys can run simultaneously or stand-alone operation, two sets of hoisting mechanism can also be run simultaneously or stand-alone operation. Low cost, simple operation and convenient maintenance, which can meet the requirement of on-site operating conditions, and has certain reference and reference value.
First, Project Background
Double-car bridge crane is suitable for manufacturing workshop, warehouse, yard, hydropower station maintenance, assembly and other places, the general handling loading and unloading operations. PHC pipe pile is a kind of cement product building material with high technological content in the pile foundation engineering of China’s construction industry with the background of the lifting demand of PHC pipe pile in a pipe pile production workshop. It has the characteristics of high bearing capacity, strong penetrating power, short construction period, stable and reliable quality, good anti-seismic and anti-corrosion performance, low comprehensive cost, environmental protection and energy saving, convenient and safe detection. In this project, 5 + 5T double-girder overhead crane is required to realize the whole pipe pile transportation, and also can lift other auxiliary parts separately. This requires that the two trolleys of crane should be designed in electrical control. To meet both to achieve single action can be achieved linkage.
Second, the overall program
Our overall program is divided into mechanical synchronization and electrical synchronization in two parts.
Mechanical synchronization: the lifting of two cars and operating agencies are using the same motor to ensure that the motor speed synchronization. At the same time in order to prevent the collision of two cars, two cars are set between the crash safety foot and crash limit switch, when the two cars running to the limit distance, safety foot crash safety switch, protection circuit power, car stop .

The car general layout structure
Electrical synchronization: The lifting mechanism adopts the cam controller + RT asymmetrical resistor + motor control mode, at the same time, the hoisting mechanism is equipped with the rising limit switch. When the rising position is up, the hoisting control circuit is de-energized. . The operating mechanism of the trolley adopts the cam controller + RT asymmetric resistor + motor control mode, and the trolley running mechanism has the limit limit switch. When the trolley runs to the limit position, the control circuit is de-energized and can only run in the opposite direction.

 Control protection circuit wiring diagram
It should be noted that the linkage consoles of this project need manufacturers to make, we use the H-type handle with buckle lock linkage console, the driver through the right hand can directly operate the lifting mechanism of the two car lift the level of the car before and after the move.
Third, the main electrical components
Lifting motor: YZR160L-6 (S3-40%) 11KW 2 sets
Car motor: YZR112M-6 (S3-25%) 1.8KW 2 units
Integrated protection cabinet: GQR-4800 1 set
Lifting resistor: RT54-160L-6 / 2B-X 2 sets
Car Resistor: RT52-112M-6 / 1B-X 2 sets
Interoperability platform: QT1B-023/4800 1 set
Fourth, the summary
Since the project was put into operation in 2012, the use of good results to meet the customer site daily hanging pipe pile use requirements. As the machine using the traditional cam controller for control, control circuit is simple, easy to maintain later, more suitable for crane work is not too frequent, less demanding on the control of the lifting place.
- See more at: http://www.nucleoncranegroup.com/double-beam-overhead-crane-double-trolley.html