Points for attention in installation of electric hoist control box 

- See more at: 

http://www.nucleoncranegroup.com/electric-hoist-control-box.html

2017年5月11日星期四

Metallurgy Electric Hoist-nucleon crane group

Metallurgy Electric Hoist-nucleon crane group

Application of Single Girder Overhead crane-nucleon crane group

Application of Single Girder Overhead crane-nucleon crane group

Application of Single Girder Overhead crane

Application of Single Girder Overhead crane
Single girder Overhead Crane
Single girder overhead crane is a two-side connection in the cement column or metal bracket, shaped like a Overhead lifting equipment. The crane is used in the workshop, the material yard and the warehouse for the lifting of heavy objects.
Overhead crane in the air and the ends of the beam can be along the elevated track on the vertical movement, use the space below the material to carry out the lifting work, to avoid the impact of the obstacles on the ground. Due to the advantages of the above single girder overhead crane, it has become one of the most extensive and largest lifting equipment.
The single girder overhead crane is used in which field? includes indoor and outdoor factory warehouse, material field, metallurgical steelmaking field, railway transportation construction field, port loading and unloading field and logistics turnover and other fields. Has become a modern industrial production and lifting transport in the indispensable tool to a certain extent, to achieve a mechanized, automated handling, improve efficiency and reduce the burden on workers.
In the operation of the single girder overhead crane, the maintenance precautions include these points
First, need to regulate the operation, certificate posts;
Second, regular maintenance, add lubricants, to ensure that the machine can be normal, safe operation;
Third, to comply with the “ten hanging” criteria, prohibit overload and to lift people.
Through the normal operation of the crane, reasonable maintenance, can reduce the crane failure, to ensure the normal operation of the machine and extend the service life.
- See more at: http://www.nucleoncranegroup.com/application-of-single-girder-overhead-crane.html#sthash.0xe0KciW.dpuf

5 Ton Electric Hoist Delivery To Port-nucleon crane group

5 Ton Electric Hoist Delivery To Port-nucleon crane group

5 Ton Electric Hoist Delivery To Port

Two sets 5 Ton Electric Hoist Delivery To Port
Dated in 27th, March, 2017, the delivery of Electric Hoist (CDH5t H=6m, A3) ordered by our Sudan clients has been done. Within the required delivery time, Nucleon crane group successfully completed the production task.

The regular feedback of the manufacture process get the trust from clients. When the equipment arrived the site, we will continue to follow up the client’s using condition and expect the future order. we have been ready.
For more details, please contact us via info@nucleoncranegroup.com

5 Ton Electric Hoist Delivery To Port-nucleon crane group

5 Ton Electric Hoist Delivery To Port-nucleon crane group

5 Ton Electric Hoist Delivery To Port

Two sets 5 Ton Electric Hoist Delivery To Port
Dated in 27th, March, 2017, the delivery of Electric Hoist (CDH5t H=6m, A3) ordered by our Sudan clients has been done. Within the required delivery time, Nucleon crane group successfully completed the production task.

The regular feedback of the manufacture process get the trust from clients. When the equipment arrived the site, we will continue to follow up the client’s using condition and expect the future order. we have been ready.
For more details, please contact us via info@nucleoncranegroup.com

2017年5月10日星期三

5 Ton overhead crane-nucleon crane group

5 Ton overhead crane-nucleon crane group

The 5 Ton overhead crane for our Pakistan customer
After 30 days of intense work, we finally installed the 3 sets 5 Ton overhead crane (Capacity: 5T Span: 18.5M Lifting height: 8m)for our Pakistan customer. We took a few photos in which can see the Commissioning and Operation of the 5 Ton overhead crane, it make our Pakistan customer happy and satisfied, and said to us, such a good product, they will help us publicity in their country, all of this makes us feel that our hard work these days is very worth.

Single Girder Overhead Crane-nucleon crane group

Single Girder Overhead Crane-nucleon crane group

Single Girder Overhead Crane 
Lift capacity: 1 – 32 Ton
Max. Lifting Height: 30m
Span:7.5 – 35 m
Control method: Pendant pushbutton control or Wireless remote control
Descriptions Of Single Girder Overhead Crane:
single girder bridge crane is design widely used for workshop or warehouse heavy loads transfering in mechanical, Metallurgy, petroleum, petrochemical, ports, railways, civil aviation, electricity, food, paper, building materials, electronics. Especially for loads precise position or precision assembly of large spare parts.
Single Girder Overhead Crane is one of our main products. We can supply various Overhead Crane for our client.
For more details, please contact us via info@nucleoncranegroup.com

2017年5月8日星期一

Overhead Traveling Crane



#Overhead Traveling Crane
China Nucleon Crane Group
#Web http://www.nucleoncranegroup.com
#Contact Skype:nucleoncranegroup
Email:info@nucleoncranegroup.com

2017年4月28日星期五

china nucleon crane group: Electric Hoist And Trolley

china nucleon crane group: Electric Hoist And Trolley: Wire rope Electric Hoist And Trolley components and the role of various functions CD electric hoist Wire rope  Electric Hoist And Trol...

Electric Hoist And Trolley

Wire rope Electric Hoist And Trolley components and the role of various functions
CD electric hoist
Wire rope Electric Hoist And Trolley components can be divided into: reducer, control box, wire rope, cone motor, push button switch.
The functions of each parts are as follows:
Reducer: is the use of three fixed shaft helical gear transmission mechanism, gear and gear shaft are all heat treatment of alloy steel, box, box made of high quality cast iron, tight assembly, good sealing.
Control box: It is a device that can cut off the main circuit in an emergency and with an upper and lower stroke protection section fire limiter.
Wire rope: The utility model adopts a lifting rope, which ensures the durability.
Cone motor: hoisting motor with a larger power torque cone-shaped rotor brake asynchronous motor, no need for external brake. Button switch: hand-operated, lightweight and flexible, sub-rope manipulation and cordless remote control in two ways.

For more details, please contact us viainfo@nucleoncranegroup.com
- See more at: http://www.nucleoncranegroup.com/electric-hoist.html

2017年4月17日星期一

Over head crane for lift steel coil



#Product Over head crane for lift steel coil
China Nucleon Crane Group
#Web http://www.nucleoncranegroup.com
#Contact Skype:nucleoncranegroup OR Email:info@nucleoncranegroup.com

2017年4月10日星期一

Girder Crane Produce





#Girder Crane Produce

China Nucleon Crane Group

#Web http://www.nucleoncranegroup.com

#Contact Skype:nucleoncranegroup

Email:info@nucleoncranegroup.com

2017年4月4日星期二

china nucleon crane group: How to prevent the gantry crane gnawing rail pheno...

china nucleon crane group: How to prevent the gantry crane gnawing rail pheno...: How to prevent the gantry crane gnawing rail phenomenon The gantry crane has become an indispensable lifting device in many fields, so...

How to prevent the gantry crane gnawing rail phenomenon

How to prevent the gantry crane gnawing rail phenomenon
The gantry crane has become an indispensable lifting device in many fields, so its safety is important. But once the gantry crane appeared gnawing rail, the great harm, will constitute a serious gantry crane trouble. And constitute the reason for gnawing is messy, big car rail coincidence degree, inclination, gauge and other construction technical parameters errors will lead to the occurrence of gnawing rail. However, the traditional method of inspection there is a big limitation, it is difficult to achieve on the gnawing rail to make preventive measures.
1, in this case, anti-chewing rail technology has been widely used. Gantry crane This technology can only be adjusted by electrical means, can not completely eliminate the gnawing rail, only in a small range of repeated adjustments, so the longer the longer the role of the more obvious.
Anti-gnawing technology can be useful to reduce the cart wheel, couplings, reducer, motor and other equipment consumption costs, to ease the product cross-regulation of billet hostile, and reduce the number of artificial repair costs, useful to reduce the staff Labor intensity. Not only that, but also to prevent the deformation of the body, the body, rail, Liang Liang played a protective effect, and to ensure the safety of the gantry crane work.

2, but also through the appropriate forward planning of the stiffness, especially the horizontal stiffness to prevent gnawing rail. For example, the main beam is usually selected horizontal stiffness and modified rigidity of the box-shaped beam planning; two horizontal level of the auxiliary role of the bridge to increase the horizontal stiffness; will be partial rail box beam reinforced plate, made horizontal structure planning; In the horizontal plane, the main beam and the end beam are rigidly connected to form a rigid frame plan.

3, because the gantry crane bound span and the base distance ratio and the gantry crane to allow free skew inversely proportional, you can ensure that the gantry crane has a certain free torsion pendulum. When the gantry crane overturned to allow free skew, through the metal planning to make the work of the two ends of the work resistance redistribution, so that the two speeds tend to come together, arrived at the synchronization.
For more details, please contact us via info@nucleoncranegroup.com
- See more at: http://www.nucleoncranegroup.com/gantry-crane.html

2017年3月28日星期二

electricity gantry crane-nucleon crane group

electricity gantry crane-nucleon crane group

electricity gantry crane

Talking about the electrical safety problems temporary electricity in gantry crane construction site
single girder gantry crane
More of the installation and use of gantry crane is in the End of main stage, after the demolition of tower crane, The temporary power consumption at the construction site is more lax in this stage:
  1. Winch under the fuselage is not connected to the PE line, or although there are PE lines, but it is not fixed, easy to loose, Zero protection effect can not be guaranteed.
  2. Hoist do not repeat grounding, if any, some grounding body also not in accordance with the requirements of specification and round steel or Angle, and replace with rebar, the grounding resistance can not meet the specified value.
  3. There is no isolating switch in the switch box, and can not use the electric equipment to carry out the power isolation during the daily maintenance . The leakage current in the switch box is too large, not in accordance with the norms of rated leakage action current 30mA, Rated leakage action time 0.1s to select, etc.
  4. When standing rectangle gantry lifting materials, there is no fixed hanging blue material measures, easy operation and the frame body produce interference, and can’t prevent slippery material (roll).
  5. The tests also found, when the gantry crane drops, some hoist operation by rolling, is a serious illegal operation. < Building hoist safety procedures> prohibit the use of “human open brake power control implementation of rolling, is a serious illegal operation. < Building hoist safety procedures>Prohibit the use of human power control to implement rolling on the brakes. Otherwise, the landing speed is too fast, too fast brake etc., Will cause the damage of hanging basket, hanging basket derailment, frame body open welding deformation and other equipment and the personal accident.
  6. Winch operator from the machine, the basket does not fall to the ground, do not cut off the power supply.
  7. The winch operator does not rectify the irregular arrangement of the steel wire rope on the drum, the steel wire rope after the force of mutual extrusion, The dead bend, the rope core extrusion, the rope structure destruction and so on, thus destroyed the steel wire rope force condition.
- See more at: http://www.nucleoncranegroup.com/electricity-gantry-crane.html

2017年3月20日星期一

Container Straddle Carrier



#Product Container Straddle Carrier

China Nucleon Crane Group

#Web http://www.nucleoncranegroup.com/container-straddle-carrier.html

#Contact Skype:nucleoncranegroup

Email:info@nucleoncranegroup.com


2017年3月16日星期四

china nucleon crane group: electromagnetic Overhead crane

china nucleon crane group: electromagnetic Overhead crane: QC Electromagnetic Overhead Crane With Magnet Cap  Electromagnetic Overhead Crane The Electromagnetic Overhead Crane has the knock-d...

electromagnetic Overhead crane

Electromagnetic Overhead Crane
The Electromagnetic Overhead Crane has the knock-down electromagnet disk. It is especially applicable to transmit the black-metallic products and materials of magneto conductivity, such as steel ingot, profiled bar and pig iron block, etc. The crane is widely used in steel rolling lines of steel company storage shipyard and workshop, etc.
This type of crane, its lifting capacity includes the weight of the carrier-beam. But the total weight doesn’t include the weight of the carrier-beam.
 Technical Parameter:
CapacityT510/316/320/532/10
Operational methodPendent line with press button /cabin/remote control
SpeedMain hook Lifting 
m/min
8 ,8/0.87,7/0.73.555
Aux. hook Lifting887
Cross travelling2020202020
Long travellingGround3030303030
Cabin6060606045.75
MotorLiftingType /kwZD141-4/7.5ZD151-4/13/
ZD132-4/4.5
ZD151-4/13/
ZD132-4/4.5
ZD151-4/13
ZD152-4/18.5
ZD162-4/30
Cross travellingZDY122-4/0.8×2ZDY122-4/1.5×2ZDY122-4/1.5×2ZDY122-4/1.5×2ZD131-4/3
Long travellingGroundZDY122-4/1.5×2YZPEY2200-4/2.2×2YZPEY2200-4/2.2×2ZDDY31M-4/12/2×3.1/1.0ZD131-4/3×2
CabinZDY122-4/1.5×2ZDR112L2-4/3×2ZDR112L2-4/3×2ZDR112L2-4/3×2YZRS114M-4/5×2
Electric hoistTypeCD1/MD1CD1/MD1CD1/MD1CD1/HCHC
Lifting heightm6,9,12,18,24,309,12,18,24
Working dutyA5
Power supplyAdjustable
Spanm7.5-22.5
Recommend rail38kg/m43kg/m

For more details, please contact us via info@nucleoncranegroup.com
- See more at: http://www.nucleoncranegroup.com/electromagnetic-overhead-crane.html