What is bridge crane installation?
What is bridge crane installation?
The installation of bridge crane,Check deformation and damage for the metal structures and mechanical electrical equipment in the transport.And repair processes,and then assembled on the ground, and then to integral lifting.The main lifting equipment of this method is a hoist lifting mast and the ground winch.Do a rotation Angle for the bridge crane whole,with stable rope continue to ascend beyond altitude,Determine the direction,according to the determine location placed in orbit.
At the top of the mast must use a certain number of cable wind rope fixed,Cable wind rope strength and fixed method shall be calculated and tested.Set the cable wind rope shall not interfere bridge in rotation in the space.At the same time must be measured before installation and pick up from the centerline of the orbit to the lateral wall.Otherwise the bridge in space rotation will be affected.
See more at: China Nucleon Crane Group
#Web http://www.nucleoncranegroup.com
#Contact Skype:nucleoncranegroup OR Email:info@nucleoncranegroup.com
订阅:
博文评论 (Atom)
没有评论:
发表评论